Plumber Cumming GA: Here, Sewer Capacity Is Part of the Deed

Most towns treat a sewer connection as a service you apply for. Cumming treats the right to discharge into its sewer as a property interest that is bought, paid for in full before a shovel moves, recorded at the county courthouse and attached to the land.

The City states it plainly. The sale of sewer capacity is an appurtenance to, touches and concerns, and benefits the property, and the capacity runs with the property and cannot be sold or assigned to any other property without the express prior written consent of the City.

That single sentence changes what due diligence looks like on a Cumming parcel, what a developer is actually buying, and what a household on a septic tank is up against when it asks to come off it. This page covers that, the three grinder pump models the City will let you install, the intake it built to survive a drought, and what it refuses to allow inside its own service area.

Talk to us about a Cumming jobAll Georgia coverage

Plumber cumming diagram of which utility assets run with the property and which belong to the owner

The lead fact

You Do Not Apply for Sewer Here. You Buy It, and It Gets Recorded.

The City publishes the price and the arithmetic. Sewer capacity inside the Water and Sewer Service Area costs 30 dollars per gallon per day. Residential capacity is worked out at 250 gallons per day per unit, so the published example is a straightforward multiplication: number of units, times 250, times 30 dollars, giving 7,500 dollars per unit.

Then come the conditions. The City requires property owners who wish to reserve capacity to pay 100 per cent of the fee up front before any construction begins, and states that no capacity is guaranteed until payment in full is received. Capacity is currently limited and is assigned to properties case by case by the Mayor and Council.

And then the part that makes this different in kind rather than in degree. The purchase agreement is not effective until it has been signed by all parties, recorded on the real estate records of the Clerk of Superior Court of Forsyth County, and filed with the utility after recording.

A recorded instrument that touches and concerns the land is not a receipt. It is an interest in the property, and it behaves like one.

What that means in practice, for four different readers

Read the row that describes you

  • Buying a Cumming parcel. Ask whether sewer capacity has been purchased for it and whether the agreement was recorded. The City itself points readers at the Forsyth County Clerk of Court records for recorded sewer capacity purchase agreements, which tells you that is where the answer lives.
  • Selling part of a parcel. Capacity bought for a whole site does not follow a piece of it automatically. The City publishes a separate Sewer Capacity Assignment Document for assigning a portion to an out-lot, and the transfer needs express prior written City consent.
  • On septic and hoping to connect. The City answers this bluntly. Sewer is available to a limited number of customers and may not be available in your area, and where it is, the connection may be gravity or may require a grinder pump. Ring the utility before you price anything.
  • Quoting the work. A capacity purchase is not a plumbing cost and should not be buried inside a plumbing quote. It is a separate transaction with the City, paid before construction, with its own paperwork including a metes and bounds legal description, a perimeter survey, the owner signature and proof of ownership.
What we will not state. We are not quoting a current water rate, sewer rate or garbage rate for Cumming. The City publishes a fee structure adopted in February 2022, effective from April 2023, with annual increases scheduled through 2027, which means any number we printed would be a snapshot of a moving schedule. The 30 dollars per gallon per day figure is stated because the City publishes it as the capacity price on the capacity page itself, but confirm it before you rely on it.
Plumber cumming list of approved grinder pump models and the low pressure sewer ownership splitLow pressure sewer

Three Approved Pumps, by Manufacturer and Model Number

Low pressure sewer is not unusual in itself. What a household needs from a utility that uses it is specificity, and Cumming gives more of it than almost anywhere we have read. Our Port St Lucie page covers how these systems work in general, so this section sticks to the parts that are local.

The City names the allowable progressive cavity sewer grinder pump brands and models: E/One DH071, Flygt Xylem MF 3068.175 and Keen KPCG-21SL. That is a short list with part numbers on it, which is a very different thing from a general specification. If a quote you are given names a fourth pump, that is a question to ask before the work starts, not after.

The ownership split is equally clear. Each homeowner purchases and installs an individual grinder pump and connects the pump service line onto the City owned force main at the street right of way. The City owns and operates the common force main inside the right of way. The homeowner owns and operates the service line and the grinder pump itself.

The City also states what it cost. The total to purchase sewer capacity and install a grinder pump was approximately 15,000 dollars as of June 2020. We are repeating that with its date attached and nothing else, because it is six years old and the capacity price alone has a scheduled increase running through 2027 behind it.

Things worth establishing before you commit

  • Whether your address is on gravity sewer or low pressure sewer. The City publishes a list of subdivisions and roadways where low pressure sewer is available, so the answer exists.
  • Which of the three approved pumps is being proposed, and that it is one of the three.
  • Who is responsible for the pump after installation. On this system it is you, not the City, which makes the warranty and the service arrangement part of the purchase decision.
  • Where the right of way boundary actually falls, because that is where your responsibility ends and the City force main begins.
  • Whether the pump will be running into a line that already has problems. A camera survey of the existing run is cheap next to a pump that fails against a blockage it was never going to clear.
Plumber cumming figures for the Lake Lanier raw water intake and treatment capacitySupply

The Town Answered a Drought With Engineering Rather Than Only Rules

The Georgia hub covers the water wars, the record low lake levels of the late 2000s and the efficiency rules the state wrote afterwards. That is the statewide half of the story and we are not telling it twice. Cumming is the local half, and it took a different route.

In the historic drought of 2007 the City 1979 intake pipe finished up well above the water, because the lake did not only drop, it receded from the shore. The City installed two temporary emergency pumps in the bed of the lake and used them to feed its 1979 and 1989 raw water pump stations.

The permanent answer was completed on 1 August 2009 at a cost of approximately 16 million dollars. The raw water intake facility can pump up to 105 million gallons a day out of Lake Lanier, and the invert of its 72 inch intake pipe sits in the bed of the lake at elevation 1020 feet above mean sea level. The City describes that as one of the deepest intakes on Lake Lanier and virtually drought-proof.

From there the water goes to a potable water production facility rated at 24 million gallons on a peak day, a conventional plant with a chemical feed system built in 2015 that doses alum, lime, sodium hypochlorite, a corrosion inhibiting phosphate, fluoride and polymers. Powdered activated carbon was added to the raw water in more recent years to deal with seasonal taste and odour.

None of that reaches a tap directly. It matters here for one reason. A household in this town that gets discoloured water in the autumn is usually seeing lake turnover rather than its own pipework, and the City says so: iron and manganese levels rise in Lake Lanier when the lake turns over in the fall, and the treatment process is modified with strong oxidants when it happens. Before you replate a fixture or blame a heater, check the season. If it persists past the turnover, then it is worth looking at the plumbing.

A prohibition with its reasoning attached

The City Refuses to Let Anyone Build a Private Treatment Plant, and Says Why

Plenty of municipalities have policies. Very few publish the argument behind one in language a resident can weigh, and this one is worth reading because the logic generalises.

The City states that it has been its policy for many years to deny requests from developers to install new private wastewater treatment facilities within its Water and Sewer Service Area. Its reason is that such facilities are generally owned and operated by a private individual or a corporation in business to make a profit, and that this is not in the community interest, especially after twenty to twenty five years of operation when equipment begins to wear out and needs replacing.

Then it asks the question directly. When these facilities cease to be a money making operation, who will foot the bill to repair or replace the system.

It also shows its working. The City bought the Lanier Beach South plant in 2004 and decommissioned it in 2015, removing its discharge pipe from Lake Lanier the same year. That plant was built in 1970, was rated at 38,000 gallons a day and had discharged treated effluent directly into the lake for over forty five years. The Habersham on Lanier plant, built in the early 1970s to serve four named developments and permitted for 110,000 gallons a day, was decommissioned in 2018 after roughly forty eight years, also discharging directly into the lake. The City states there are no more private facilities inside its service area.

For anyone buying into an older lakeside development anywhere, that is the shape of the risk in one paragraph. A private plant is a capital liability with a clock on it, and the clock is roughly a working generation long.

Lead, briefly and honestly

Two Date Rules That Sound Like One and Are Not

Our Marietta page already covers what it means when a Georgia utility completes a service line inventory and finds no lead, and Cumming is heading for the same answer, so we are keeping this short and pointing you there for the general case.

What is worth isolating here is that the City is running two exercises with two different date rules, and confusing them wastes everybody time.

The service line material survey targets homes constructed before 1990. The City reports it has investigated 927 of 5,358 such customer service lines and has so far found no lead, and it asks owners of pre-1990 homes to complete a survey with photographs.

The federal lead and copper sampling programme is narrower. Those samples, the City says, can only be taken from homes built after 1982 and before June 1988, because lead solder in the joints of copper pipe is the mechanism being tested for. Participation is voluntary, the draw must be cold water after at least six hours of standing, and the City notes its own corrosion control began in 1988.

Plumber cumming comparison of the lead sampling date band and the service line survey date

Said plainly, and kept short on purpose

Three Local Rules Where Only the Detail Is New

The leak adjustment. How a Georgia leak adjustment works in general is set out on our Alpharetta page for the county system next door, and we are not rewriting it. Three Cumming specifics are worth carrying. If the City notifies you of a leak, it is your responsibility to find and repair it within 30 days of being notified. An adjustment is limited to one every 24 months. And irrigation water consumption is not eligible for an adjustment at any time, which makes a leaking sprinkler system the most expensive leak on the property here.

The City also requires a receipt for parts or a paid bill from a licensed plumber with the request, and will accept a notarised letter describing the repair if you did the work yourself and have no receipt. Requests must be filed within 90 days of the first higher than normal bill, and are not available on developer, builder, apartment or master meter accounts, on delinquent accounts, or within 90 days of a certificate of occupancy on a new build.

The grease interceptor. Grease traps are on a great many pages of this site and the case for maintaining one does not need making again. The Cumming sizing rule is the part that is genuinely local, and it is a formula rather than a table. Each grease trap must allow for 15 gallons per seat, multiplied by the hours of operation divided by twelve, multiplied by a loading factor. The City worked example is a 200 seat establishment at 24 hours arriving at 6,000 gallons.

No single trap may be smaller than 1,000 gallons or larger than 3,000, so above that you install several. The City publishes a photograph of a neglected trap whose owner it fined 2,400 dollars.

Where the leaks actually are. The City runs a leak identification crew and periodically hires a contractor with listening equipment and leak correlators to sweep segments of the system. Its own conclusion from that work is the useful sentence: most of the time, leaks occur in privately owned water service lines that transport water from the meter to a home or business. That is an argument for treating an unexplained bill as a private side investigation first.

Plumber cumming summary of the water distribution system and wastewater treatment timelineScale

What the Utility Says It Runs

Cumming Utilities puts approximately 22,000 water meters in the ground and over 300 miles of water mains behind them, and describes a distribution and collection division that maintains hydrants, water and sewer lines, manholes and utility locates, clears easements and rights of way, repairs meters and jets and unclogs sewer pipes.

On the wastewater side it publishes a sixty year sequence rather than a single number. The City built the area first wastewater treatment facility, a five acre oxidation pond, in 1963. In 1991 it moved treatment to Bethelview Road as a 2 million gallon a day advanced water reclamation facility, expanded that to 3 million gallons in 1999, and rebuilt it between 2006 and 2008 at 8 million gallons a day for just over 30 million dollars. Treatment ends with ultraviolet disinfection and discharge into Big Creek.

One figure from that page is worth flagging as a claim rather than a fact. The City presents the plant cost as 30 million dollars divided by 8 million gallons a day, giving 3.75 dollars per gallon, and invites a comparison with others in the region. That is the City own framing of its own project and we are reporting it as such rather than endorsing the comparison.

There is also a septic charge published, which is unusual and useful if you are on a tank. The City charges 0.15 dollars per gallon to discharge a septic truck into the Bethelview Road facility, and puts a typical 2,000 gallon load at 300 dollars. All waste haulers must obtain a permit to discharge from the pretreatment coordinator, so a hauler working in Cumming should be able to say who permitted them.

Straight Answers

Plumber Cumming Questions, Answered From the Utility’s Own Pages

Every answer traces to a Cumming Utilities or City of Cumming source named at the foot of this page. Dated figures are given with their dates so you can see how old they are.

If it adds units or adds discharge, almost certainly yes, and it is a separate transaction from the plumbing. The City sells capacity inside its Water and Sewer Service Area at 30 dollars per gallon per day, works residential capacity out at 250 gallons per day per unit, requires 100 per cent payment up front before construction begins and guarantees nothing until payment is received in full. Capacity is limited and is assigned case by case by the Mayor and Council. Ask the utility before you price the work.

Look for a recorded agreement. The City states that a sewer capacity purchase agreement is not effective until signed by all parties, recorded on the real estate records of the Clerk of Superior Court of Forsyth County and then filed with the utility, and it points readers at those county records for exactly this purpose. The capacity runs with the property, so the question is not whether the seller paid, it is whether the instrument was recorded against this parcel.

Not on your own. The City states that capacity cannot be sold or assigned to any other property without express prior written City consent, and publishes a separate Sewer Capacity Assignment Document for splitting a portion off to an out-lot. Treat it as a conveyancing step with a utility approval attached, not as a form.

The City names three allowable progressive cavity models: E/One DH071, Flygt Xylem MF 3068.175 and Keen KPCG-21SL. It also sets out who owns what. You purchase, install, own and operate the pump and its service line out to the City force main at the right of way, and the City owns and operates that common force main. The City put the total for buying capacity and installing a pump at approximately 15,000 dollars as of June 2020, which is a dated figure and should be re-checked.

Possibly, and there is a clock on it. If the City notifies you of a leak it is your responsibility to find and repair it within 30 days. A request must be filed within 90 days of the first higher than normal bill, needs a parts receipt or a paid bill from a licensed plumber or a notarised letter if you did the work yourself, and adjustments are limited to one every 24 months. Irrigation consumption is never eligible at any time, so a leaking sprinkler line is the one leak you will pay for in full.

Check the calendar before you check the plumbing. The City says iron and manganese levels rise in Lake Lanier when the lake turns over in the fall, as cooling surface water sinks and pushes deeper water up, and that it modifies treatment with strong oxidants when it happens. If discolouration tracks the season and clears, that is the lake. If it persists, or it is on one fixture or one side of the house, that is your pipework and worth a look.

Cumming publishes a formula rather than a table. Each interceptor must allow 15 gallons per seat, multiplied by hours of operation divided by twelve, multiplied by a loading factor. The City worked example takes 200 seats at 24 hours to 6,000 gallons. No single trap may be under 1,000 gallons or over 3,000, so a larger requirement is met with several units. Sizing and maintenance frequency both live in the utility ordinance, and the City has fined at least one operator for failing to maintain.

No. Septic tanks in this area are regulated by the Forsyth County Environmental Health Department, and the City points you there. The City does publish what it charges a hauler to discharge at its reclamation facility, 0.15 dollars per gallon with a typical 2,000 gallon truck at 300 dollars, and requires every waste hauler to hold a discharge permit from its pretreatment coordinator. If you want to come off septic and onto sewer, that is the capacity conversation at the top of this page.

Show your working

Where Every Figure Came From, and What We Refused to State

The capacity price, the 250 gallon per day residential unit, the 7,500 dollar worked example, the up front payment rule, the case by case assignment by Mayor and Council, the appurtenance and runs with the property language, the Superior Court recording requirement and the assignment document are from the utility sewer capacity page. The three approved pump models, the ownership split at the right of way, the HDPE force main sizes and the June 2020 total are from its grinder pump page.

The intake completion date and cost, the 105 million gallon capacity, the 72 inch pipe, the 1020 foot invert elevation, the drought-proof description and the 2007 emergency pumps are from its raw water page. The private plant policy and its reasoning, the two decommissioned facilities with their dates and capacities, are from its private plants page.

The 927 of 5,358 service lines, the pre-1990 survey and the 1982 to June 1988 sampling band are from its lead and copper testing page, and the 30 day repair rule, the 24 month limit and the irrigation exclusion from its leak policy page. The treatment, grease, septic and system size figures are from the matching pages in the same section. All read on 1 August 2026.

What we refused to state, and why. No water, sewer or garbage rate, because the published fee structure was adopted in 2022, took effect in 2023 and carries scheduled annual increases through 2027, so any figure would be a snapshot of a moving target. No hardness or treated water chemistry figure, because the water quality report was not opened and a list of treatment chemicals is not a result.

No taste and odour explanation beyond the seasonal cause, because the compounds involved are already explained properly elsewhere on this site and repeating them here would be padding. No claim about which addresses have sewer available, because the City says capacity is limited and assigned case by case and publishes a service area map for the rest. No endorsement of the City own cost per gallon comparison of its treatment plant. No septic regulation detail, because that is Forsyth County rather than the City. No current count of lead service lines, because the survey is explicitly incomplete at 927 of 5,358. And nothing from a third party aggregator.

No office, address, crew or response time of ours is stated for Cumming. Capacity prices, fee schedules, approved equipment lists, adjustment policies and service area boundaries all change, and this utility has a multi-year rate schedule running. Confirm anything that matters with Cumming Utilities before relying on it.